The elevator in the ERC is now in working order.
The elevator in the TAC remains inoperable. We are waiting for a new control panel to arrive on campus.
To reach the second floor of the TAC, please use the ERC elevator, or use the elevator in the Student Center and travel over the bridge to the ERC then into the TAC.
Please email facilities@clarkson.edu if you have any questions.